As part of this project, I had to chose a section of my design to illustrate a detail plan. I chose to detail the mixed-use area, located on the southwest corner of the site.
Overall, I was pleased with the product of this phase of the project. After reviewing the plan, there are a few things I wish would have been done differently:
1. Increase the building setbacks to 10 feet, instead of 5.
2. Reconfigure some of the balcony spaces.
3. Provide a greater amount of gathering space within the interior of the courtyard (smaller waterfeature, increased gathering space).